8 BALL DRIVEWAYS

How It's Done

Home
About 8 ball
How It's Done
How much is it going to cost?
Discount
Contact Us

Here are the procedures on how each job is carried out:

Prep Work

#1 We start out by removing any dust pebbles or foreign debris that is not securely fastened to the drive way.

#2 Next scrub any oil or gas spots that will interfere with the seal coating process.

#3 Then we fill each crack ( less then 5/16 in dia.) with a special crack caucking.

#4 Lastly we prime any hazardous liquid stains(gas,oil,etc.) with a special primer.

Seal Coating

#1 We proceed to tape every corner to assure that the Tarmac will stay on the driveway, not your sidewalk or grass.

#2 We must wait 1 hour for the priming to completely dry.

#3 We then proceed to apply the Tarmac.

- You will be able to walk on your drive way in as little as 2 to 3 hours. You will be able to drive on your driveway after 24 hours.

info@ourcompany.com

8 BALL DRIVEWAYS