|
Prep Work
#1 We start out by removing any dust pebbles or foreign debris that is not securely fastened to the drive way.
#2 Next scrub any oil or gas spots that will interfere with the seal coating process.
#3 Then we fill each crack ( less then 5/16 in dia.) with a special crack caucking.
#4 Lastly we prime any hazardous liquid stains(gas,oil,etc.) with a special primer.
|
 |
|
|
|
 |
|
Seal Coating
#1 We proceed to tape every corner to assure that the Tarmac will stay on the driveway, not your sidewalk or grass.
#2 We must wait 1 hour for the priming to completely dry.
#3 We then proceed to apply the Tarmac.
|
 |
|
|
|